MIS LOG IN

PGRR136

Summary

Title Large Load Interconnection Study Scope Documentation
Next Group
Next Step
Status Withdrawn

Action

Date Gov Body Action Taken Next Steps
01/08/2026 ROS Deferred/Tabled ROS for consideration

Voting Record

Date Gov Body Motion Result
01/08/2026 ROS To table PGRR136 Passed

Background

Status: Withdrawn
Date Posted: Nov 25, 2025
Sponsor: Schaper Energy Consulting
Urgent: No
Sections: 9.3.2
Description: This Planning Guide Revision Request (PGRR) implements targeted revisions to Section 9.3.2 to strengthen Large Load Interconnection Study (LLIS) scoping requirements and improve transparency across ERCOT, Transmission Service Providers (TSPs), and Interconnecting Large Load Entities (ILLEs) by enhancing documentation.
Reason: Strategic Plan Objective 2

Key Documents

Related Content